Tuesday, 21 November 2023

'No emergency exit was built inside the tunnel'

'If you are constructing the tunnel in the Himalayan region, then if you have constructed 10 metres of tunnel, first you will have to do proper treatment and ensure the stability of this constructed structure.'

from rediff Top Interviews https://ift.tt/BQtFj0r

No comments:

Post a Comment

RBI Governor: 'Rates may remain low in near to medium term'

"It is quite possible that the rates will remain low in the near to medium term, but that will depend on how conditions evolve," s...